Sohni Sadak Yojna

Making our road better

Stage 2: Finding the Gaps

Stage 1 recorded what is there; Stage 2 records what is wrong, and why it matters

  • We walk the corridor again, and take GPS-tagged pictures of each problem: broken footpaths and kerbs, potholes, junctions that need improving, and accident blackspots.
  • We watch how pedestrians and vehicles move.
  • We talk with local businesses and road users about the difficulties they face.
See moreSee less

Turning it into drawings and plans

We mark every problem in the AutoCAD file, and list the gaps in pedestrian access, vehicle movement and junctions, each with its picture. Our list of problems stays in our team's Google Sheet.

With the ULB

We share the drawing with the problems marked.

What to share

Short videos explaining the problems we found and how they affect road users, in a constructive tone.

On the portal

We link the marked drawing and the list of problems.

What good work looks like

  • Every significant problem on the corridor is recorded, with a picture and its place on the drawing.
  • Road users have been heard.
  • The ULB has the drawing.
  • Our pictures and videos show the problems fairly.