Stage 1: Knowing the Road
Survey the corridor as it is today, so every later step is based on facts

- We share the corridor among us so that all of it is covered.
- We survey the existing utilities, the right of way (ROW), how easy it is to walk along and across, and the surroundings.
- We do a basic traffic count at a busy time.
See moreSee less
Turning it into drawings and plans
We mark the corridor on a map with its surroundings, and draw the survey in an AutoCAD file with proper layers. Every later stage uses this base drawing.
With the ULB
We introduce our team to the ULB, and confirm the corridor we are working on.
What to share
Short videos explaining our corridor and its surroundings, as the start of our work on it.
On the portal
We link the base drawing, as a PDF, and the survey notes.
What good work looks like
- The whole corridor has been surveyed.
- The drawing is layered, and accurate enough to design on.
- The ULB knows our team and our corridor.
- Our pictures and videos introduce the road clearly.